Maintaining SV Alana

Maintenance information and documentation for SV Alana - H28 Ketch

Index

Online Documents

These are snapshots of the schematic diagrams we produced when replacing and upgrading electrical systems. Original documents are in Visio format.

Ship's Library Catalogue

The bookshelf on board carries operating manuals almost every piece of equipment carried:

  • Bukh DV20 Operator's Guide
  • Bukh DV20 Workshop Manual
  • Garmin GPS Manual
  • Raymarine Autohelm Manual & Quick Reference Card
  • Raymarine ST40 Wind Manual & Quick Reference Card
  • Raymarine ST40 Speed Manual & Quick Reference Card
  • Refrigerator manual
  • Profurl manual
  • AM/FM/CD/MP3 player manual
  • VHF Radio manual
  • Smart Alternator Regulator manual

Maintenance Notes

  Date Notes
Standing Rigging 2004

Replaced all SWR, bottlescrews, clevis pins, etc in both masts upon delivery to Sydney (masts were already unstepped for road transport). All rigging is oversized.

Running Rigging 2004 Replaced all halyards, sheets, topping lifts, outhauls, etc. while masts were unstepped.
Mast wiring 2004 Replaced all 12V wiring and light fittings while masts were unstepped. All wiring is tinned copper. Double insulated cable is used within masts, as well as PVC conduit where possible.
Cabin wiring 2004 Replaced all 12V wiring within cabin, except for anchor winch. New wiring is all tinned copper.

 

Paint Reference

  Purpose Paint Qty
Hull Undercoat    
  Antifouling    
  Gelcoat original. Unkown  
  Metal fittings    
Propeller Undercoat    
  Antifouling    
Topsides Toe rail Teak oil  
  Sponsons Teak oil  
  Bowsprit Teak oil  
  Cockpit coaming Schooner gloss  
  Grab rails Schooner gloss  
  Dorade boxes Schooner gloss  
  Companionway Schooner gloss  
  Control box Schooner gloss  
  Gelcoat Original. Unknown  
Cabin All timberwork Scooner gloss  

 

Maintenance & Operations Schedule

Maintenance Schedule for SV Alana
Interval Task Comments
Every Day
  • Operate all seacocks
  • Check engine fluid levels
  • Visual inspection of engine & wipe down
  • Operate fridge compressor
  • Ventillate cabin and engine room
  • Operate engine
  • Operate head
  • Operate pumps
  • Test radio
These tasks are completed with every use, and at least once every 3 weeks
1 Month
  • Check sight bowl in water separating filter.
  • Check and replace plastic sail slides as required
Still haven't found water...

2 Months

  • Inspect rigging and deck equipment
  • Check nav lights
  • Check Autohelm
Service as required
3 Months
  • Flush freshwater tank
  • Flush bilge
  • Apply teak oil to toe rail
  • Apply teak oil to sponson
  • Apply teak oil to bowsprit
 
6 Months
  • Drain engine oil
  • Replace oil filter & oil
  • Clean and replace fuel filters
  • Inspect/replace engine anode
  • Inspect raw water pump impeller
  • Climb mast and inspect fittings & rigging
 
Annual
  • Slip vessel
  • Inspect, clean, and lubricate seacocks
  • Waterblast hull
  • Lightly sand hull with wet & dry
  • Apply fresh antifoul paint
  • Polish gelcoat on hull
  • Replace anodes (prop shaft & rudder)
  • Inspect bobstay & fittings
  • Inspect rudder fittings
  • Apply fresh anitfoul paint to propeller
  • Varnish cockpit brightwork
  • Varnish grab rails on cabin top
  • Varnish dorade boxes on cabin top
  • End-for-end anchor chain
 
10 Years
  • Replace SWR rigging to comply with insurance requirements
Last replaced in 2004
Refuelling
  • Add biocide to diesel tank
 
As Required
  • Lubricate winches
  • Service pumps